Contract No.

HK/2009/05 (Stage 1), HK2011/07 (Stage 2), HK/2015/01 (Stage 3)

Owner / Developer

Civil Engineering and Development Department & Highways Department

Location and Project

Central - Wan Chai Bypass and Island Eastern Corridor Link (CWB) running along the north shore of Hong Kong Island from Central to North Point with 4.5 km long dual 3-lane trunk road with a 3.7 km long tunnel, associated ventilation buildings and air purification system and public transport interchange, comprising of 8nos. HyD work contracts.

 

Wan Chai Development Phase II with 12.7 ha of land reclamation and seawall construction, entrusted work of CWB, structures spanning over existing MTR Tsuen Wan line, cross harbour water mains, submarine sewage outfall pipelines, re-provision of ferry piers and public transport interchange and associated road and drainage works comprising of 6 nos. CEDD works contracts. 

Scope of Works

Provision of Environmental Monitoring and Audit (EM&A), including but not limited to measurement, sampling, laboratory testing, continuous noise monitoring, results analysis, reporting and auditing, as stipulated in the applicable Environmental Permits, the corresponding EM&A Manuals and approved Environmental Impact Assessment (EIA) Reports for the Project.

Year of Completion

Stage 1 - 2012; Stage 2 - 2015; Stage 3 - On-going

Environmental

Wan Chai Development Phase II and Central – Wan Chai Bypass – Sampling, Field Measurement and Testing Works